National Planning Practice Guidance Natural environment section, Interim Supplementary Planning Document 23 Mitigation Strategy for European Sites, https://www.southtyneside.gov.uk/article/36021/Supplementary, https://www.gov.uk/government/organisations/natural, http://www.durhambiodiversity.org.uk/biodiversity. It should be noted that in most circumstances surface water is not permitted to be connected to the public combined or foul sewers. For Listed Building Consent applications they must: Where appropriate a Design and Access Statement may also include a Heritage Statement (see requirement 16). Earlier this week (July 13), South Tyneside Council registered an . The table at the end of this chapter provides indicative thresholds for when a TS or TA and TP are required. The gross internal area of the property should be provided to include all habitable rooms and all built-in spaces designed specifically for storage. Supporting calculations should be included in the Drainage Assessment. Snap a photo, and login with your selfie instead. Standing buildings, structures and complexes form part of the archaeological resource and should be treated in an equivalent manner to other parts of the resource. Archaeological Evaluation Report (field walking, earthwork survey, geophysical survey and/or trial trenching). Additional information is required to determine whether a charge is due and to determine the amount. Written consent, in principal, must be obtained from either the EA or LLFA if the point of discharge is to an ordinary watercourse or main river. A Planning Application Additional Information Requirement Form is required to be competed for all relevant applications in Gateshead, North Tyneside and Newcastle to calculate CIL liability. Tel: 0191 427 7000. Core Strategy Policies CS1, CS13, CS15 and CS16, Unitary Development Plan Policies DC1 (g) and MWR35, Sustainability Statements Planning Process Note (November 2021), Site Specific Allocations Policies SA1, SS2, J2 and H2. This involves supporting GP appraisers through mentoring, and training. 950 talking about this. The required information will relate to matters that, it is reasonable to think, will be a material planning consideration in the determination of the application. A sequential assessment and impact assessment are not required for planning applications that are in accordance with an up-to-date development plan. To avoid delay, applicants should discuss, as soon as possible, what information is needed with the LPA and relevant expert bodies such as Highways England, Natural England, Historic England, Environment Agency, Sport England, The Coal Authority, Lead Local Flood Authority, Marine Management Organisation, County Archaeologist, and Highway Authority etc. Skip navigation. An applicant should apply for this vacant building credit at the time of submitting the planning application. National Planning Policy Framework Chapter 13 and 16, The statement should include a strategy to reduce CO, National Planning Practice Guidance Climate change section. The submitted scheme shall, as applicable, include: existing trees, shrubs and other landscape features (indicating which are to be retained and which removed); planting plans, specifications and schedules; existing and proposed levels and contours; means of enclosure, walls, retaining walls and boundary treatment; paving and other surface treatment including car parking and circulation layouts; items of landscape furniture, equipment, storage, signage, and lighting; services and drainage; location of site cabins and compounds. However, if the sequential test is passed there are still some vulnerable types of development that should not normally be allowed in Flood Zones 2 and 3 unless there are exceptional circumstances. Transport Statement (TS): A simplified version of a transport assessment where it is agreed the transport issues arising out of development proposals are limited and a full transport assessment is not required.
Mead's Fine Bread Company, 2025 Lacrosse Player Rankings, Asp Net Core Application Insights Telemetry Initializer, Articles N